Gaps were finalized for the bridges I plan to add. The roadbed was aligned and leveled. Risers were marked and cut to sit flush with the bottom of the bench work.
Starting at the staging yard joint, I clamped risers and did final leveling and secured the roadbed, working down from the top at the same time.
I took this opportunity to run the bus wires for this section of the railroad as well.
No comments:
Post a Comment