Starting the sub-roadbed. After figuring radius and placement, pieces were cut and the double deck portion of the layout was set on temporary risers clamped to the bench work to set the height. Staging yard on the bottom, Toledo on the top.
Curvature laid out, the large piece of plywood in the last shot will be 3 G's Lumber mill at Wrens, OR.
No comments:
Post a Comment