Friday, October 16, 2015

Making the Grade

Risers were clamped to the bench work and roadbed pieces laid out, leveled and prepped for attachment.













Breaking Ground

Starting the sub-roadbed.  After figuring radius and placement, pieces were cut and the double deck portion of the layout was set on temporary risers clamped to the bench work to set the height.  Staging yard on the bottom, Toledo on the top.



 Curvature laid out, the large piece of plywood in the last shot will be 3 G's Lumber mill at Wrens, OR.












The Sky's the Limit

Backdrop material, 1/8 Masonite hardboard and pine 1x2 boards. 


Starting withe the center section:





Moving on to the "peninsula" section.  I wanted to curve the backdrop and make it double sided.








The hardboard was secured to 1x2 strips.  Along the walls, there is a strip between the hardboard and the wall as well.



Cutting New Life Into Old Wood

Decisions, decisions..  Criteria had to be met, fill as much as the room as practical, make it removable and make it work for me.  I had some bench work given to me a few years ago, after attempts to fit the bench work to the space I have, the decision was made to disassemble and reuse the lumber.  It's all ripped 3/4 inch plywood, strong but heavy.


One pile of wood:





Cuts were made, test fitting the framework:




All three bench work sections assembled and risen:






New Beginnings

After settling in after a much needed move, it's time to get settled on a much needed railroad.  I model the Southern Pacific Railroad in July, 1967.  My primary focus in on the Oregon Division and it's involvement in the lumber industry.  I have toyed around for a long time with ideas on a layout based on the Southern Pacific's Toledo Branch.  This line ran from Albany, OR to Toledo, OR after being cut back from Yaquina Bay.  Join me and step back in time as a small piece of a vast railroad empire is recreated in 1:160 scale.